SecondEye
Sample Bid Review · Electrical

This is what you get back.

A real SecondEye review, start to finish. The bid is a made-up example so no one's privacy is exposed. The price ranges and comparisons come from real jobs in the St. Louis area.

Project: Main panel upgrade + new kitchen circuits  ·  Bid total: $7,200  ·  Area: St. Louis

Bottom line

The price is reasonable. The bid doesn't say what you're buying.

At $7,200 it sits inside the typical $3,200–$11,511 range we see for comparable panel-and-circuit jobs, so you're not being gouged on the number. But the bid never states the one spec that defines a panel upgrade, the service amperage (100A vs 200A), and it leans on "bring the home up to code" without saying what that includes.

Before you sign: get the amperage, the permit, and a definition of "up to code" in writing. Those three answers tell you whether $7,200 is a complete bid or a placeholder that grows.

Scope completeness

Grade: C

It identifies the job, which keeps it out of the bottom, but it leaves out nearly every spec that makes a panel bid comparable, and it parks $600 in an unexplained "misc. materials and labor" line.

Missing from the bid:

What's fine: the scope is identifiable and the total is in range.

Price read

$7,200 fits the scope

$3,200this bid: $7,200$11,511

Comparable panel jobs in our St. Louis data run $3,200–$11,511, with a median around $5,690. If this is a full 200A service change with a new meter, $7,200 is fair to good. If it's a like-for-like 100A swap, it's on the high side. The missing amperage is what makes that unclear.

The best-graded electrical bids in our data all state the amperage and list the permit as its own line. This one does neither yet.

Red flags

Three things to push on

Questions to ask before you sign

Send these back to the contractor

  1. What amperage is the new service, 100A or 200A? What panel brand, and how many circuit spaces?
  2. Does the price include the permit and the rough and final inspections?
  3. Does "up to code" include new GFCI protection in the kitchen, baths, and exterior, and AFCI in the bedrooms? Which circuits specifically?
  4. Is a new ground rod, clamp, and water-pipe bond included?
  5. Is $7,200 a fixed price, or can the "misc. materials and labor" grow? What's covered in that $600?

SecondEye is independent. We don't sell leads or take referral fees. Reviews are based on real bids and paid invoices plus trade-scope standards, and are not a substitute for a licensed inspection or engineering opinion.

Want this for your bid?

Delivered within 24 hours. Save at least $99, or your money back.

Get your bid reviewed — $99